I took the kids up to see the Landon this evening. From what we have seen from how fast they
framed our neighbors, we figured some major headway would be made on
Monday. It looks like Monday the
remaining first floor walls were put up and all of the first floor internal
walls. Our neighbor looks like nothing
was done. The wood beams spanning the
openings of the first floor were installed in preparation of the 2nd
floor. We still don’t have windows in or
the external vapor barrier. It seems
like the framers working on two houses at once has things moving slow……like
watching paint dry.
Other news, rates have dropped and I started shopping around
outside of NVR. The difference between
the base rate and the APR is really high for NVR. It looks like even with their 7k incentive,
their closing costs are much higher. I
know some banks have 0 loan origination fees.
I wonder if NVR jacks up the price just to discount it off so it looks
like it’s a better deal. From what I can
see so far, the prior rate given to me was lousy, but pushing back and shopping
around is getting better rates from NVR.
Here is the updated picture
You can see a hole in the plywood sheeting
Outside hole in the plywood sheeting
Corner with ripped off plywood
The I-Beam stopped short so the HVAC can go up there
Beams for the 2nd story
Weird framed in area......I suspect for the main HVAC duct work
Not sure there should be light there
The indent into the garage
No comments: